Commercial results

A summary of projects and the most important thing: the commercial results!

Read more...

1. Haul Truck Motors – Coal Mine

  • Project was completed in 2001 on 26 trucks, 55 motors.
  • EXAKT reduced Mean Time Before Replacement from 19,700 to 13,500 hours.
  • Failures dropped from 100% to 26% (this is the minimum cost level based on the Company’s ratio of Preventive Replacement cost to Replace on Failure cost (1:3).
  • Total fleet maintenance costs for the motors dropped from $1.46m to $1.09m for an annual savings of $371,000 or 25%.
  • If the 1:3 ratio was increased to 1:6 for example to take account of these other real costs of failure, then the annual savings are $1.46m. (Note 1:6 is still very low by normal commercial standards)
  • Other commercial benefits not included in the calculations:
    • higher revenues from fewer failures and less downtime
    • reduction in fleet size due to fewer and shorter out-of-service conditions
    • avoidance of contract penalty costs due to non-delivery

2. Circulating Pumps – Liquid Fuel Production

  • Project was based on historical data from 8 pump bearings involving 11 failures.
  • Original Replace on Failure policy caused swap outs at 404 days; company had shifted to 215 days to reduce the failure rate.
  • EXAKT recommended 263 days, dropping failures to only 4.
  • Cost of failure included replacement costs and loss of production. Failure replacement took 8 hours and contribution to the company was valued at $4460 per hour per pump.
  • Annual Replace on Failure cost was $306k versus the cost of the Company’s current policy of $261k.
  • EXAKT’s recommended policy reduced costs to $162k for savings of about $100,000 compared to the current policy, and $140,000 compared to Replace on Failure. This represents a cost reduction of 38%.
  • No account was taken of the benefits to the Company resulting from:
    • Avoidance of contract penalty costs
    • Loss of reputation with customers
    • Government penalties due to environmental spills and safety issues

3. Nuclear Fuel Rod Seals

  • 30 seals examined with a history of 25 failures.
  • Existing policy was Replace on Failure at 657 days – cost was $4.56 per replacement cycle.
  • EXAKT’s proposed Preventive Replacement policy reduced this to $3.56 per cycle for a savings of 22%
  • Time involved in failure replacement only was considered.
  • No commercial benefit was calculated for protecting the revenue stream from power generation losses or loss of reputation as a result of power fluctuations and brown-outs.

4. Gear Boxes

  • 11 single reduction helical gearboxes were run to failure on a test-bed
  • considering only failure repair versus preventive replacement cost, the cost reduction from applying EXAKT was 33%
  • no additional cost data was measured

5. Copper Mine – Haul Truck Motors

 

  • Project was conducted on Rocker Arm Gaskets in the haul truck motor; a sample of 92 with 9 recorded failures was used.
  • Replace on Failure policy showed expected time between replacements of 3677 hours, for an annual cost of $26m.
  • EXAKT recommended to replace on 2705 hours for an annual cost of $20m
  • Annual cost reduction is 23% or $6m
  • EXAKT data was extracted from Mincom Ellipse

6. Chemical Processing Plant – Compressors

 

  • Company produces feedstocks for petroleum production
  • Equipment was two stage hydrogen compressor – sample size was 45 with 37 recorded failures.
  • Data was extracted from Datastream MP2.
  • Phase 1 of the project concentrated on understanding concepts and setting up the data collection process
  • The Final Report said “EXAKT established the links between Condition Based Maintenance (CBM) data and failure; confident failure predictions and optimized maintenance decisions using EXAKT will be possible shortly”
7. Food Processing Company – Shear Pump Bearings

 

  • 21 condition variables monitored; of these only three proved to have a significant impact on the failure mode
  • This resulted in a “significant reduction in data collection and analysis costs”
  • EXAKT’s preventive replacement recommendation led to 55% reduction in costs compared to the Company’s practice of Replace on Failure
  • Preventive replacement led to a 10% increase in equipment life and a corresponding reduction in capital cost
  • No other financial data is currently available


8. Light Rail Transit System – Wheel Bearings

 

  • Company had excessive failures of traction motor bearings – up to 9 per year.
  • Bearing failures cause serious loss of confidence in rider safety.
  • EXAKT added one critical variable to be monitored – bearing grease colour and recommended the Inspection Interval be reduced from 3.5 years to 1 year
  • EXAKT recommendations:
    • reduced the units’ maintenance costs by 55%
    • reduced failures from 9 to 1
    • reduced Condition Based Maintenance data collection costs by $3m annually

9. Pulp Mill – Pump bearings

 

  • 33 bearing histories were examined in 8 pump locations, including 11 failures.
  • EXAKT recommendation would have prevented 10 of 11 failures, and reduced the Mean Time Between Replacement by 7% (from 571 to 529 days)
  • This resulted in a cost saving of over 30%
  • based on a ratio of Preventive Replacement cost to Replace on failure cost of 1:3
  • no account was taken of revenue protection caused by the lower failure rate or of damage to reputation from environmental spills